JobSiteCore for commercial contractors

Bids written for a GC or a facility manager

Commercial is who you sell to, not what you do — you could be any trade, so nothing about your setup changes shape. What changes is who the quote is written for: the AI is told your buyer is a GC or a facility manager, so bids come out organized the way they get read, and general conditions go on as billable lines instead of getting eaten.

Updated September 26, 2026

What a commercial buyer grades — and what changes

Scope gaps become change orders

Allowances, alternates and unit prices stay three separate things on the bid, so the GC can level it without guessing what you meant.

General conditions get smuggled or eaten

Supervision, temporary facilities, hoisting, safety and cleanup are priced as their own lines instead of absorbed into overhead.

Homeowner paper in front of a business buyer

When your customer signs, the contract carries no three-day cancellation right — that is homeowner law, and your buyer is a business.

Sections that follow the job

Commercial bids run 30 to 80 lines, organized the way a GC reads them:

Division
a CSI MasterFormat division — “03 30 00 — Cast-in-Place Concrete”
Area
a building area — “Level 2 — East Wing”
Suite
a tenant space — “Suite 210 — Tenant Improvement”
Wage basis
on public work, the bid states the wage basis it assumed instead of guessing

What a Commercial Construction company starts with

Sections of a job

You quote by room and by floor — Kitchen · Living Room · Master Bedroom and 10 more, across Main Level · Level 2 · Level 3 and 5 more.

Phases on the schedule

Planning & Design · Permits & Approvals · Demolition · Foundation · Framing · Rough-Ins (Plumbing/Electrical) — and the rest of the standard construction schedule.

Equipment you track — shown in the app as Assets

Type it in. Ready-made buttons only exist for the trades that service the same named machines again and again.

Your price book on day one

16 priced line items, loaded the moment your company is created — a working price book before your first quote.

  • Demolition & tear-outea$850
  • Debris haul-off & disposalload$350
  • Permit & inspection coordinationea$500

The full 79-category list, in the same order for everyone — no trade gets moved ahead of another.

How your quotes come out

The AI here was taught how commercial bids get read, not just relabeled. Quote sections follow the job — “Suite 210 — Tenant Improvement” instead of a bedroom — allowances, alternates and unit prices stay three separate things, supervision and cleanup get priced as their own lines, and on public work the bid states the wage basis instead of guessing. When your customer signs, the contract carries no three-day cancellation right — that’s homeowner law, and your buyer is a business.

Read straight from the app’s own setup for Commercial Construction companies. Starting prices are yours to edit.

Questions from commercial contractors

Does picking Commercial change my trade setup?

No. Commercial is a buyer market, so your price book, job sections and schedule stay the standard setup for whatever trade you run. What changes is how the AI writes the bid and what the signed contract carries.

Does the contract include the three-day cancellation notice?

No. That notice is homeowner law. For a commercial company the signed contract leaves it out, and what the signer saw is stored with the signature.

Can a bid carry allowances and alternates?

Yes. Allowances, alternates and unit prices are kept as three distinct things on the bid, and general conditions are priced as their own lines.